ENGLISH中文

NEWS

Company News

PSC Detain Case Study 13

2024-05-15

PSC Detain Case Study 13

[100] Short of embarkation ladders complying with the requirements of LSA CODE which to afford access to the survival craft when waterborne(比较短的引水梯被用作了登乘梯)

[101] 
The port side life raft and lifeboat launching instructions found not under emergency lights

[102] Liferafts (P & S) not connected to HRU as per manufacturer`s instructions

[103] 
Both liferafts(P & S)  not ready for use because those painter lines were not attached to weak links.

[104] Life raft painter line not properly connected.

[105] Type of liferafts equipped onboard not matched to SE certificate. (The certificate required 4 davit launched liferaft but actually 3 davit launched and TOB equipped)

[106] Butterfly nuts could not be accepted to access openings on chain lockers for watertightness.

[107] N
ot carried out sufficient familiarization with garbage management plan.(船员不熟悉垃圾管理计划)

[108] 
Rescue boat engine cooling water pump defective

[109] 
Sewage treatment plant defective




BACK

Copyright©CPN Frontier (Shanghai) Co., Ltd Powered by Shbewell