ENGLISH中文

NEWS

Company News

Two ships SS/DD in Tsuneishi dock yard Japan in Mar and May 2022

2022-05-24

In Mar., 2022, MV Scarlet Arrow under our CPNF managed, docked-in Tsuneishi 
Dock yard in Japan.
This is Scarlet Arrow first five year Renewal Survey (SS) docking. 

Dockrepair Team:
Superintendent in Charge: Mr.YU Chengfeng
Superintendent in Site: Mr.Kono Takanori.
Master: Capt.CAO Zhenting.
C/E: ZHOU Enwen.
C/O: ZHENG Qingdong.
1/E: Du Lifeng.


In May, 2022, MV Crystal Arrow , CPNF Fleet, docked in Tsuenshi dockyard Japan.
Sister Ship of MV Scarlet Arrow. Also 1st Special Survey docking (SS).

Dockrepair Team:
Superintendent in Charge: Mr.ZHOU Xiaodong.
Superintendent in Site: Mr.Kono Takanori.   Mr. Noboru Ken.
Master: Capt.TU jun.
C/E: WANG Feng.
C/O: YI Kewen.
1/E: YAO Jian.


Both ship's Particular,

SHIP'S FLAG ISLE OF MAN
PORT OF REGISTRY DOUGLAS
CLASSIFICATION DNV
INT'L GROSS TONNAGE 9993
INT'L NET TONNAGE 4486
D/W TONNAGE 12310 . 0 0   M/T
LENGTH O.A. 142.99  METERS
LENGTH B.P. 140.10  METERS
BREADTH MOULDED  22.60   METERS
DEPTH TO MAIN DECK 11.30    METERS
MAX. DRAFT "FULL SUMMER DRAFT"  8.225  METERS
FULL LOADED DISPLACEMENT 17437 TONS
LIGHT SHIP 5127 M/TONS
TON PER CM  27.39 TONS/CM(Draft:8.225m)
BOW TO BRIDGE 129.64 METERS
HT FROM KEEL TO TOPMAST 45.493  METERS
SERVICE SPEED 18.0 KNOTS(Daft:7.4m)
SHIP'S BULT DELIVRERY:2017
HATCH COVER SYSTEM PONTOON TYPE
HATCH SIZE          #1 CH-12.60 x 13.50/8.10)    #2 CH-12.60 x 18.90/13.50) 
#3CH-12.60 x 18.90)#4 CH-12.60x18.90)#5 CH-12.80x 18.90) 
#6 CH-12.60 x 18.90)#7CH-12.60 x 18.90)
DERRICK / CRANE FULLY CONTAINERIZED VESSEL

   

    

   

   

BACK

Copyright©CPN Frontier (Shanghai) Co., Ltd Powered by Shbewell